Hollingworth Creek Bridge Area

22/9/15 -Large tree fallen across creek and blocking debris.2/7 /18-This is not a good start

 

222/9/15 - This looks interesting-hopefully it will pull out.
2/7/18 – This looks interesting-hopefully it will pull out.
22/9/15- Another blockage at the Eastern corner behind the Mower Shop.
2/7/18- Another blockage at the Eastern corner behind the Mower Shop.
22/9/15-Blockage continues.
2/7/18-Blockage continues.
22/9/15 - Further problems around the corner.
2/7/18 – Further problems around the corner.
22/9/15 - Looking North/West across creek.
2/7/18 – Looking North/West across creek.
22/9/15 - Looking towards the Chocolate Factory.
2/7/18 – Looking towards the Chocolate Factory.
22/9/15 - The creek bank beside the factory.
2/7/18 – The creek bank to the East of the factory.
22/9/15 = Looking West
2/7/18- Looking West
22/9/15 - More Blockages to contend with.
2/7/18 – More Blockages to contend with.
22/9/15 - Debris caught on pipe supports near bridge.
2/7/18- Debris caught on pipe supports near bridge.
22/9/15- More debris directly under bridge.
2/7/18- More debris directly under bridge.
22/9/15=Another photo from the West looking under the bridge.
2/7/18=Another photo from the West looking under the bridge.
22/9/15-Western side of Bridge.
2/7/18-Western side of Bridge.
22/9/15=Minor blockage a little further upstream.
2/7/18=Minor blockage a little further upstream.
22/9/15-A more substantial blockage further down.
2/7/18-A more substantial blockage further down.
22/9/15-Floating Debris near end of project.
2/7/18-Floating Debris near end of project.
22/9/15= More debris and logs.
2/7/18= More debris and logs.
22/9/15= Looking East from Hollingworth Bridge.
2/7/18= Looking East from Hollingworth Bridge.
22/9/15=Higher shot from Bridge.
2/7/18=Higher shot from Bridge.