2/7/18 – This looks interesting-hopefully it will pull out.2/7/18- Another blockage at the Eastern corner behind the Mower Shop.2/7/18-Blockage continues.2/7/18 – Further problems around the corner.2/7/18 – Looking North/West across creek.2/7/18 – Looking towards the Chocolate Factory.2/7/18 – The creek bank to the East of the factory.2/7/18- Looking West2/7/18 – More Blockages to contend with.2/7/18- Debris caught on pipe supports near bridge.2/7/18- More debris directly under bridge.2/7/18=Another photo from the West looking under the bridge.2/7/18-Western side of Bridge.2/7/18=Minor blockage a little further upstream.2/7/18-A more substantial blockage further down.2/7/18-Floating Debris near end of project.2/7/18= More debris and logs.2/7/18= Looking East from Hollingworth Bridge.2/7/18=Higher shot from Bridge.